The pipe is decided first. The covering is decided last. That is
the problem.
Underfloor heating is designed at the moment the loops are laid, but the
floor covering is chosen weeks later, often by someone else. Between those two
decisions sits a physical fact: heat has to pass through whatever is laid on
top. Every covering adds resistance, and resistance costs supply
temperature.
Three things change with the covering: how much heat reaches the room, how
quickly the floor responds, and what surface temperature you are allowed to
run.
Resistance, not thickness
It is not the millimetres that matter — it is the declared thermal
resistance of the whole build-up: the covering, any underlay, and the adhesive
or floating layer under it. A thin covering with a trapped air layer can resist
more than a thicker one that conducts well.
This is why the useful question to a flooring supplier is not "how thick is
it" but "what thermal resistance does it declare for underfloor heating". If
there is no figure, the product was not designed for this application, and the
design has to absorb the uncertainty.
Tile and stone
Ceramic, porcelain and stone have low thermal resistance and high
conductivity. They take heat from the screed quickly, distribute it laterally,
and feel warm underfoot. For a given supply temperature they deliver the highest
output of the three families, and they respond fastest when the manifold
opens.
The trade-off is at the edges: hard coverings move, and they need movement
joints where the area is large or the geometry changes. A heated floor moves
slightly more than an unheated one.
Wood
Wood sits in the middle, and the spread within the category is wide.
Engineered boards with a thin wear layer behave far better than thick solid
timber. The concerns are two:
Output. Wood resists heat more than tile, so the same supply temperature
produces less. The design compensates with closer loop spacing or a slightly
higher supply temperature — both of which must be decided before the screed goes
down.
Movement. Solid wood shrinks and swells with moisture and temperature. A
heated floor reduces the moisture swing but raises the temperature swing.
Engineered construction and a correctly acclimatised installation handle it;
thick solid boards over a hot screed are the combination that fails.
Carpet
Carpet plus underlay is the highest-resistance build-up in common use, and
thick underlay can be close to an insulator. A room can have underfloor heating
that works everywhere else and does not work here.
This does not make carpet impossible. It makes it a design constraint:
lower output means denser loops or a higher supply temperature, and the underlay
has to be declared suitable. What fails is the project where carpet is added at
handover to a floor designed for tile.
The consequence of deciding late
If the covering changes after the screed is poured, the options are limited
and all of them are worse than designing correctly: raise the supply temperature
(which may exceed the surface limit of the new covering), increase flow (which
may exceed the pump), or accept a cooler room.
The cheapest moment to fix this is on paper. A one-line note in the loop
schedule — covering type, declared resistance, design output — prevents the
entire problem.
What to hand to the installer
The covering type and its declared thermal resistance, per room.
Whether an underlay is included, and its resistance.
The design output required at the stated supply temperature.
Any area where the covering differs from the rest of the floor.
Movement joint locations for hard coverings.
A short comparison

Design the floor covering into the loop layout, not after it. RITABLE
supplies the pipe, the manifold and the floor heating modules that make a